★★★★★(0)
1000 IN STOCK
Panther Force 2M 2.4A Fast Charging USB to Lightning Cable Extra Long Lead
Bulk OrderSecure checkout
Dispatched from UK
30-day exchange
Panther Force 2M 2.4A USB to Lightning Cable
Extra Long Reach & Fast Charging (Model: PF16)
Charge your iPhone comfortably from the sofa, bed or desk with 2 metres of reach and 2.4A fast charging output.
Key Features
- 2.4A fast charging
- Extra-long 2-metre length
- Fast charging and data transmission
- Durable high-quality materials
Specifications
- Brand / Model: Panther Force PF16
- Connectors: USB-A to Lightning
- Length: 2 metres
- Colour: White
- Packaged weight: approx. 80–105 g
Package Includes
✓ 1 × Panther Force PF16 2M Lightning Cable
✓ Retail hanging box
Product Description
Panther Force 2M 2.4A USB to Lightning Cable
Extra Long Reach & Fast Charging (Model: PF16)
Charge your iPhone comfortably from the sofa, bed or desk with 2 metres of reach and 2.4A fast charging output.
Key Features
- 2.4A fast charging
- Extra-long 2-metre length
- Fast charging and data transmission
- Durable high-quality materials
Specifications
- Brand / Model: Panther Force PF16
- Connectors: USB-A to Lightning
- Length: 2 metres
- Colour: White
- Packaged weight: approx. 80–105 g
Package Includes
✓ 1 × Panther Force PF16 2M Lightning Cable
✓ Retail hanging box
Reviews 0
Same day dispatch
Money guarantee
30-day exchange
Online support
12/6 Support care
Flexible payment
Multi-card payment























































